Application of a Coupled Land Surface-Hydrological Model to Flood Simulation in the Huaihe River Basin of China  | 
	
|   Figure 4   Differences between CLHMS-simulated streamflows and observations in a 2003, b 2007, c 20 May to 29 July 2000, and d 17 September to 16 November 2000. Differences for Lutaizi and Bengbu stations are shown as solid and dashed lines, respectively.  | 
	![]()  |